Do not extend the siding or trim into the kick out flashing or gutter.
Lp siding installation instructions.
How to install lp smartside trim siding.
For installations over masonry or concrete walls the wall.
Use housewrap flashing tape z flashing or other items as needed to maintain the counterflashing principle.
Lp smartside trim siding products are treated with our proprietary smartguard process.
Installation is easy and the finished result is a durable strong and beautiful exterior.
Subject to such installation are excluded from coverage under the lp smartside limited warranty.
16 inches 406 mm o c.
Download our helpful installation instructions and watch our informative how to videos.
Lp canexel prefinished siding delivers the authentic look of traditional wood with the strength of treated engineered wood at a cost effective price.
Lp smartside trim and fascia can be applied directly over materials such as siding or fastened directly to structural members.
Shall be furred out and open at the top and bottom of the wall.
Install step flashing with minimum 4 in.
Install kick out flashing to direct the water into the gutter install step flashing with minimum 4 in.
Tools and materials as in standard construction practices install smartside siding by nailing to studs spaced 16 inches on center using hot dipped galvanized nails.
Find product specifications warranties installation instructions and msds for all lp building solutions in our product literature resource center.
With four components of protection the process adds strength and helps our products withstand impacts freeze thaw cycles high humidity fungal decay and termites.
Spaced a maximum of 24 inches 610 mm o c.
Use housewrap flashing tape z flashing or other items.
Upper leg properly integrate flashing with the secondary water resistive barrier.
To allow for convective ventilation between framing spaced.
Contractors watch this video to learn about the advantages of using lp smartside trim siding products and how to install them.
Upper leg properly integrate flashing with the secondary water resistive barrier.
The framing shall be of adequate.